A FULL LOAD
INSTALLATION
We will arrange a date with you the customer to commence the installation. Stone will be arranged and delivered to site. Our machinery will move in and start the works immediately. When your package wastewater treatment system is installed, we will commision it on site. All paperwork will be then emailed or posted to the customer in the following days.
The Dig
Dig
We will then dig where your tank, treatment filter or percolation areas are.
When your garden is in situ, we will respect this. We will do our best to keep disruption to a minimum.
The Percolation
Stone
Stone is laid under this Ecoflo Treatment System for percolation purpose.
Ecoflo Coco Filter can result in a very small footprint, under or over the ground.
Percolation Area
Install
Percolation area


It is important to us to keep the disruption to your garden as minimal as we possibly can.

A selection of photographs from supply and installations completed by Riordan Construction


Example of how our customer used the Ecoflo Coco Filter which due to ground conditions and their planning specifications had to be installed overground. Give it a year or two and the tank will no longer be visible from their lawned garden area.

CONTACT US TODAY AND WE CAN HELP YOU
The Environmental Protection Agency today reported on 1,160 Local Authority inspections of septic tanks and other domestic waste water treatment systems in 2019.
The EPA found that more than half of the systems failed inspection. A lack of maintenance and desludging was identified as a key issue. The Local Authorities identified more serious issues with nearly 300 systems where they were found to be a risk to human health or the environment.
The EPA has planned to inspect 1,000 in 2022 and increases to 1,200 in 2023–2026